[单选题]

The steam turbine parameters should match with that of the( )

A.gas turbine

B.boiler

C.transformer

D.pulverizer

参考答案与解析:

相关试题

The boiler parameters should match with that of ( ).

[单选题]The boiler parameters should match with that of ( ).A.the generatorB.the st

  • 查看答案
  • What is an advantage of a steam turbine

    [单选题]What is an advantage of a steam turbine over a diesel for the main propulsion?()A . Faster response from ahead to asternB . Less fuel consumptionC . Cheaper initial installation costD . Less weight per unit of horsepower

  • 查看答案
  • The control panel of the steam turbine must( )clean every day.

    [单选题]The control panel of the steam turbine must( )clean every day.A.keepB.to ke

  • 查看答案
  • The sounds/praiz/should match the word__________.

    [单选题]The sounds/praiz/should match the word__________.A.prizeB.praiseC.priceD.pi

  • 查看答案
  • The power generated in the turbine must

    [单选题]The power generated in the turbine must () that required by the compressor.A . be less thanB . be larger thanC . be as large asD . not be so large a

  • 查看答案
  • Default constructors with no parameters

    [主观题]D.efault constructors with no parameters passed.

  • 查看答案
  • The match was cancelled because most of the members ( ) a match without a standard court.

    [单选题]The match was cancelled because most of the members ( ) a match without a s

  • 查看答案
  • As for turbine oil, contact with water i

    [单选题]A.s for turbine oil, contact with water in the form of steam will be inevitable so good______properties will be essentialA.defrostingB.de-oilingC.demulsifyingD.dehumidifying

  • 查看答案
  • In an auxiliary boiler steam and water s

    [单选题]In an auxiliary boiler steam and water system, the highest pressure will be in the ().A . steam stop valveB . dry pipeC . feedwater systemD . generating tube

  • 查看答案
  • After passing through the turbine the ex

    [单选题]After passing through the turbine the exhaust gas is conducted out into the().A . intercoolerB . compressorC . cylinderD . open air

  • 查看答案
  • The steam turbine parameters should match with that of the( )