A.Continue to search for an insurance company that would assume the risk
B.Place special emphasis on the risk event to intensely manage that item and all interfacing items
C.Play down the risk and the team will find a means of overcoming any failure
D.Ignore the risk assessment because any assigned value is a point estimate which is never precisely the expected state of nature
[单选题]D.uring the risk analysis process, it is determined that one identified risk event cannot be avoided, mitigated, or insured. This risk event is a critical item that could cause the project to fail if it occurs. The best option for the project manager
[单选题]( )is the process of implementing risk response plans,tracking identified r
[单选题]The()process analyzes the effect of risk events and assigns a numerical rating to those risks.()A.Risk Identification B.Quantitative Risk AnalysisC.Qualitative Risk Analysis D.Risk Monitoring and Control
[单选题]The()process analyzes the effect of risk events and assigns a numerical rating to those risks.A . Risk IdentificationB . Quantitative Risk AnalysisC . Qualitative Risk AnalysisD . Risk Monitoring and Control
[单选题] SWOT analysis is a kind of risk identification method. If the project team chose the SO strategy, they should __(75)__.(75)A.make full use of the advantage and catch the opportunityB.overcome the weakness and catch the opportunityC.make full use of
[单选题]SWOT analysis is a kind of risk identification method.If the project team chose me WT strategy, they should( ). A.overcome the weakness and reduce the threat B.make full use of the advantage and reduce the threat C.overcome the weakness and catch the
[名词解释] 有害生物风险分析(Pest Risk Analysis,PRA)
[单选题]Which of the following is least likely to fall under the heading of event r
[单选题]One tool that is useful during both analysis and design is the ( ), which i
[单选题]The ( ) process analyzes the effect of risk events and assigns a numerical