In readying an auxiliary water-tube boiler for a routine hydrostatic test, which of the following procedures should be undertaken prior to filling the boiler with fresh water?()

A . The safety valve escape piping should be disconnected from the valve body and a blank inserted

B . The boiler vent valves should be opened

C . All handhole/manhole covers should be tightened up as much as possible to preclude any leaks

D . All of the above

参考答案与解析:

相关试题

The water in an operating auxiliary boil

[单选题]The water in an operating auxiliary boiler should be tested for alkalinity and chloride content each().A . hourB . dayC . weekD . month

  • 查看答案
  • The water in an auxiliary boiler should

    [单选题]The water in an auxiliary boiler should be tested for chloride content to determine ( ).A.total dissolved solidsB.salt contaminationC.water harcnessD.chlorine contamination

  • 查看答案
  • The water in an auxiliary boiler should

    [单选题]The water in an auxiliary boiler should be tested for chloride content to determine ().A . total dissolved solidsB . salt contaminationC . water hardnessD . chlorine contaminatio

  • 查看答案
  • In an auxiliary boiler steam and water s

    [单选题]In an auxiliary boiler steam and water system, the highest pressure will be in the ().A . steam stop valveB . dry pipeC . feedwater systemD . generating tube

  • 查看答案
  • H AUXILIARY WATER TEMPERATURE TSHH-713表示

    [填空题] H AUXILIARY WATER TEMPERATURE TSHH-713表示()。

  • 查看答案
  • I’m afraid there are people in the world who literally do not know how to boil water.

    [单选题]I’m afraid there are people in the world who literally do not know how to b

  • 查看答案
  • 辅助给水系统/应急给水系统 auxiliary feed water syste

    [名词解释] 辅助给水系统/应急给水系统 auxiliary feed water system/emergency feed water system

  • 查看答案
  • ()接头用于Tube管和Tube管之间的连接。

    [填空题] ()接头用于Tube管和Tube管之间的连接。

  • 查看答案
  • tube表示中文()。

    [单选题]tube表示中文()。A . 管子B . 圆棒C . 线材

  • 查看答案
  • The procedures recommended for auxiliary

    [单选题]The procedures recommended for auxiliary boilers having high salinity include ().A . treating with oxygen scavengersB . securing the boiler and giving it a blowing downC . increasing the pHD . reducing the phosphate level

  • 查看答案
  • In readying an auxiliary water-tube boil