[单选题]

The required amount in the change of speed necessary before a governor will make a corrective movement is known as ().

A . speed droop

B . sensitivity

C . stability

D . promptne

参考答案与解析:

相关试题

The greatest amount of detailed capital budgeting analysis is typically required when deciding wheth

[单选题]The greatest amount of detailed capital budgeting analysis is typically req

  • 查看答案
  • A群链球菌致热性外毒素(SPE)的主要流行型是A、SPE£­AB、SPE£­BC

    [单选题]A.群链球菌致热性外毒素(SPE)的主要流行型是A.SPE-AB.SPE-BC.SPE-CD.SPE-DE.SPE-F

  • 查看答案
  • Change in demand vs.change in quantity d

    [主观题]C.hange in demand vs.change in quantity demanded 需求变化与需求量的变化

  • 查看答案
  • Change in demand vs.change in quantity d

    [名词解释] Change in demand vs.change in quantity demanded 需求变化与需求量的变化

  • 查看答案
  • A change in the supply of bread is least likely to result from a change in:

    [单选题]A change in the supply of bread is least likely to result from a change in:

  • 查看答案
  • is the budgeted amount for the work actu

    [单选题]is the budgeted amount for the work actually completed on the schedule activity or WBS component during a given time period.A.Planned valueB.Earned valueC.Actual costD.Cost variance

  • 查看答案
  • In the late seventies , the amount of fi

    [试题]Inthelateseventies,theamountoffixedassetsrequiredtoproduceonevehicleinJapanwas______equivalenttothatintheUnitedStatesA.)rudelyB)roughlyC)readilyD)coarsely

  • 查看答案
  • The amount of fluid delivered by a posit

    [单选题]The amount of fluid delivered by a positive displacement pump can be regulated by _____.A.throttling the pressure lineB.changing the speed of the driving rotorC.either A or BD.None of the above is tree

  • 查看答案
  • (c) Calculate and explain the amount of

    [试题](c) Calculate and explain the amount of income tax relief that Gerard will obtain in respect of the pensioncontributions he proposes to make in the tax year 2007/08 and contrast this with how his position could beimproved by delaying some of the contr

  • 查看答案
  • ()is the budgeted amount for the work ac

    [单选题]()is the budgeted amount for the work actually completed on the schedule activity or WBS component during a given time period.A . Planned valueB . Earned valueC . Actual costD . Cost variance

  • 查看答案
  • The required amount in the change of spe