[试题]

 In the late seventies , the amount of fixed assets required to produce one vehicle in Japan was ______ equivalent to that in the United States

A.) rudely           B) roughly               C) readily          D) coarsely

参考答案与解析:

相关试题

A) still late B) too late C) so late D)

[单选题]A.) still lateB.) too lateC.) so lateD.) past

  • 查看答案
  • Between the late 1950s and the late 1970

    [单选题]B.etween the late 1950s and the late 1970s, infant mortality in northern Africa______.A.still remained highB.fell sharplyC.was lower than that in AsiaD.rose tremendously

  • 查看答案
  • ________ late for the meeting

    [单选题]________ late for the meetingA.Not beB.NotC.Don’tD.Don’t be

  • 查看答案
  • The amount of fluid delivered by a posit

    [单选题]The amount of fluid delivered by a positive displacement pump can be regulated by _____.A.throttling the pressure lineB.changing the speed of the driving rotorC.either A or BD.None of the above is tree

  • 查看答案
  • (c) Calculate and explain the amount of

    [试题](c) Calculate and explain the amount of income tax relief that Gerard will obtain in respect of the pensioncontributions he proposes to make in the tax year 2007/08 and contrast this with how his position could beimproved by delaying some of the contr

  • 查看答案
  • The required amount in the change of spe

    [单选题]The required amount in the change of speed necessary before a governor will make a corrective movement is known as ().A . speed droopB . sensitivityC . stabilityD . promptne

  • 查看答案
  • The amount of fuel injected in a particu

    [单选题]The amount of fuel injected in a particular time, or degree, of crankshaft rotation is termed ().A . meteringB . timingC . rate of injectionD . rate of distributio

  • 查看答案
  • The amount of lubricating oil in the dra

    [单选题]The amount of lubricating oil in the drain tank should be checked by ().A . measuringB . sounding rodC . meteringD . weighting

  • 查看答案
  • ()is the budgeted amount for the work ac

    [单选题]()is the budgeted amount for the work actually completed on the schedule activity or WBS component during a given time period.A . Planned valueB . Earned valueC . Actual costD . Cost variance

  • 查看答案
  • is the budgeted amount for the work actu

    [单选题]is the budgeted amount for the work actually completed on the schedule activity or WBS component during a given time period.A.Planned valueB.Earned valueC.Actual costD.Cost variance

  • 查看答案
  • In the late seventies , the amount of fi