[试题]

very rough estimate选择

It __________ according to where you live, and this is a very rough estimate

[A] shifts

[B] converts

[C] modifies

[D] varies

参考答案与解析:

相关试题

If your propeller is racing in rough wea

[单选题]If your propeller is racing in rough weather,you should().A . decrease your engine speedB . ignore itC . increase your engine speedD . stop your engine until the rough weather passe

  • 查看答案
  • A sketch B rough C preliminary D imprope

    [单选题]A. sketch B rough C preliminary D improper

  • 查看答案
  • A) sketch B) rough C) preliminary D) dra

    [单选题]A.) sketchB.) roughC.) preliminaryD.) draft

  • 查看答案
  • Changing an accounting estimate:

    [单选题]Changing an accounting estimate:A.Is reported prospectively.B.Requires rest

  • 查看答案
  • 在高尔夫术语中,“Rough”的意思是()。

    [单选题]在高尔夫术语中,“Rough”的意思是()。A . 浅草区B . 障碍区C . 沙坑D . 粗草区

  • 查看答案
  • The Estimate Activity Resource process

    [单选题] The Estimate Activity Resource process is closely coordinated with the (73)process.(73)A. Estimate CostsB. Sequence ActivitiesC. Plan CommunicationsD. Conduct Procurements

  • 查看答案
  • Estimate activity durations is the proce

    [单选题]E.stimate activity durations is the processof estimating the number of work periods to complete indivities with estimatedresources . the tools and technques is not including().A.expert judgmentB.analogous estimatingC.requiremen tstraceability matrixD

  • 查看答案
  • The Estimate Activity Resource process i

    [单选题]The Estimate Activity Resource process is closely coordinated with the(73) process.A.Estimate CostsB.Sequence ActivitiesC.Plan CommunicationsD.Conduct Procurements

  • 查看答案
  • The Estimate Activity Resource process i

    [单选题]The Estimate Activity Resource process is closely coordinated with the(73)process.A.Estimate CostsB.Sequence ActivitiesC.Plan CommunicationsD.Conduct Procurements

  • 查看答案
  • (b) Using sensitivity analysis, estimate

    [试题](b) Using sensitivity analysis, estimate by what percentage each of the under-mentioned items, taken separately,would need to change before the recommendation in (a) above is varied:(i) Initial outlay;(ii) Annual contribution. (4 marks)

  • 查看答案
  • very rough estimate选择