[单选题]

The requirements of the ISM Code may be applied to

A.only oil tankers

B.only passenger ships

C.only containers

D.all kinds of ships

参考答案与解析:

相关试题

The objectives of the ISM Code are to en

[单选题]The objectives of the ISM Code are to ensure ①safety at sea②prevention of human injury or loss of life③avoidance of damage to the marine environment and to propertyA.①B.②C.②③D.①②③

  • 查看答案
  • ISM Code.在()通过。

    [单选题]ISM Code.在()通过。A . 1993.7.1B . 1994.5.24C . 1995.7.1D . 1996.7.1

  • 查看答案
  • 我国政府规定,对船舶实施ISM Code认证工作由()执行,对船公司实施ISM

    [单选题]我国政府规定,对船舶实施ISM Code认证工作由()执行,对船公司实施ISM Code认证工作由()执行。A . 中华人民共和国海事局/中国船级社B . 中国船级社/中华人民共和国交通运输部C . 中华人民共和国海事局或船级社/中华人民共和国交通运输部D . 中国船级社/中华人民共和国海事局

  • 查看答案
  • The purpose of the requirements definit

    [单选题]The purpose of the requirements definition phase is to produce a clear,complete,consistent,and testable (66) of the technical requirements for the software product.D.uring the requirements definition phase,the requirements definition team uses an ite

  • 查看答案
  • The purpose of the requirements definiti

    [单选题]The purpose of the requirements definition phase is to produce a clear, complete, consistent, and testable(71 )of the technical requirements for the software product.During the requirements definition phase, the requirements definition team uses an i

  • 查看答案
  • In requirements engineering, requirement

    [单选题]In requirements engineering, requirements elicitation is the practice of collecting the requirements of a system from users, customers and other stakeholders. In the following practices, () is rarely used in requirements elicitation.A . brain stormi

  • 查看答案
  • During the project, requirements chang

    [单选题] During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and c

  • 查看答案
  • During the project, requirements change

    [单选题]During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and ch

  • 查看答案
  • During the project, requirements change

    [单选题]D.uring the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and c

  • 查看答案
  • Requirements management is the process o

    [单选题]Requirements management is the process of ()A .communicatingB .collectingC .filingD .documenting

  • 查看答案
  • The requirements of the ISM Code may be