[单选题]

The process during which liquid containing a reasonable amount of sensible heat at a particular pressure immediately changes into steam after admitted to a chamber at a lower pressure is called _____.

A.boiling off

B.flash evaporation

C.condensation

D.none of the above

参考答案与解析:

相关试题

It is a process during ______ the body r

[单选题]It is a process during ______ the body releases water to cool the skin.A. whenB. whichC. whereD. that

  • 查看答案
  • During the risk analysis process, it is

    [单选题]D.uring the risk analysis process, it is determined that one identified risk event cannot be avoided, mitigated, or insured. This risk event is a critical item that could cause the project to fail if it occurs. The best option for the project manager

  • 查看答案
  • During the transfer process,()are needed

    [单选题]During the transfer process,()are needed.A . Hardware such as logistics facilities and equipment (logistics carriers) are neededB . Information control and standardizationC . Supports from the government and logistics associationD . All of them

  • 查看答案
  • Every liquid has a pressure at which it

    [单选题]E.very liquid has a pressure at which it will vaporize and this pressure varies with temperatureThe word “which” means _____.A.a liquidB.a pressureC.a temperatureD.none of the above

  • 查看答案
  • The science teacher demonstrated the process of turning solid gold into liquid.

    [单选题]The science teacher demonstratedthe process of turning solid gold into liqu

  • 查看答案
  • The( )process ascertains which risks hav

    [单选题]The( )process ascertains which risks have the potential of affecting the project and documenting the risks’characteristics. A.Risk Identification B.Quantitative Risk Analysis C.Qualitative Risk Analysis D.Risk Monitoring and Control

  • 查看答案
  • The ()process ascertains which risks hav

    [单选题]The ()process ascertains which risks have the potential of affecting the project and documenting the risks' characteristics.A . RiskldentificationB . Quantitative Risk AnalysisC . Qualitative Risk AnalysisD . Risk Monitoring and Control

  • 查看答案
  • The______process ascertains which risks

    [单选题]The______process ascertains which risks have the potential Of affecting the proect and documenting the risks' characteristics.A.Risk IdentificationB.Quantitative Risk AnalysisC.Qualitative Risk AnalysisD.Risk Monitoring and Control

  • 查看答案
  • Valve overlap is the period during which

    [单选题]Valve overlap is the period during which ().A . the inlet valve is openB . the exhaust valve is openC . both valves are closedD . both valves are ope

  • 查看答案
  •  Which of the following is the last step in the process of writingessays?

    [单选题]Which of the following is the last step in the process of writingessays?A.E

  • 查看答案
  • The process during which liquid containi