[单选题]

B.asically, a(71)is a standalone process or a set of integrated processes that runs on a router or server to control the flow of(72)application traffic(73)through it. Typically, firewalls are(74)on the entry point to a public network such as the Internet. They could be considered traffic cops. The firewall' s(75)is to ensure that all communication between an organization's network and the Internet conform. to the organization's security policies.

A.router

B.client

C.firewall

D.switch

参考答案与解析:

相关试题

Basically,a(71)is a standalone process

[单选题]Basically,a(71)is a standalone process or a set of integrated processes that runs on a router or server to control the flow of(72)application traffic(73)through it.Typically,firewalls are(74)on the entry point to a public network such as the Internet

  • 查看答案
  • The passage is basically a ______.

    [单选题]The passage is basically a ______.A. biography of John Paul JonesB. criticism of John Paul JonesC. history of the United States NavyD. comparison of the American and Russian navies

  • 查看答案
  • Basically, a computer consists of five

    [单选题] Basically, a computer consists of five components: (71), memory, storage, input device and output device.(71)A.keyboardB.mouseC.monitorD.CPU

  • 查看答案
  • The program memory serves basically as a

    [单选题]The program memory serves basically as a place(66)instructions, the coded pieces of data(67)direct the activities of the control processing unit(CPU). A group of(68)related in- structions stored in memory is referred to as a program. The CPU "read"

  • 查看答案
  • cochleariform process

    [名词解释] cochleariform process

  • 查看答案
  • 进程(process)

    [名词解释] 进程(process)

  • 查看答案
  • 过程(process)

    [名词解释] 过程(process)

  • 查看答案
  • The process of translating the qualityma

    [单选题]The process of translating the qualitymangement plan into executable quality activities that incorporate theorganization's quality policies into the project.A.Manage qualityB.Quality auditC.Quality metricsD.Quality improvement

  • 查看答案
  • is the process of obtaining the stakehol

    [单选题]is the process of obtaining the stakeholders' formal acceptance of the completed project scope. Verifying the scope includes reviewing deliverables and work results to ensure that all were completed satisfactorily.A.Project acceptanceB.Scope verific

  • 查看答案
  • is the process of obtaining the stakehol

    [单选题]is the process of obtaining the stakeholdrs’formal acceptance of the completed project scope. Verifying the scope includes reviewing deliverables and work results to ensure that all were completed satisfactorily.A.scope definitionB.WBS CreationC.proj

  • 查看答案
  • Basically, a(71)is a standalone process